Implementation Blueprint

A transparent plan. Fixed timelines. No surprises.

Three phases, sequenced to deliver value fast and de-risk integration progressively. Phase 1 goes live in 4 weeks with zero IT infrastructure changes.

1
Generic How-To

Weeks 1–4

2
Policy Integration

Weeks 5–8

3
Dossier Integration

Weeks 9+

1

Phase 1 · Weeks 1–4

Generic "How-To" Questions

Your Team

Lexular

Sign PO

Project kickoff agreement

— awaiting kickoff

Intake meeting

Security requirements review · Share 20,000 historical emails

Categorize questions

AI-assisted topic clustering across email corpus

— Lexular working

Prototype answers

Draft answer taxonomy per category · deploy to review environment

3 × 2-hour CSR review

Validate categories and answer quality with your customer representatives

Validate & iterate

Incorporate CSR feedback · refine taxonomy · update answer quality

Go-Live

End of week 4 — CSRs using Lexular in production

Production ready
2

Phase 2 · Weeks 5–8

Policy (Polis) Questions

Phase 2 adds a secure connection to your policy documentation and coverage databases. It requires IT infrastructure alignment first (weeks 5–6), followed by deployment and CSR review (weeks 7–8).

Your Team

Lexular

Kick-off meeting (2 hrs)

IT infrastructure requirements · security scope definition

Analyze current documentation

Map policy database structure · identify integration points

3 × 2-hr IT feedback sessions

Review technical architecture proposal · security sign-off

Technical architecture proposal

Secure connection design · data access scope · encryption model

IT infrastructure & security sign-off

Formal approval to connect to policy systems

Prototype polis answers

Live integration with policy database · deploy to staging

3 × 2-hr CSR feedback sessions

Validate policy answer accuracy with customer representatives

Deploy & production-harden

Final audit trail configuration · monitoring setup

Go-Live

End of week 8 — polis questions fully automated

Policy layer live
3

Phase 3 · Weeks 9+

Dossier Questions — Full Core Integration

Phase 3 enables real-time personal data access — claim status, reimbursement history, account details. The scope and timeline are always determined in a dedicated scoping session, as every core system integration is unique.

A
Core System Scoping
  • ·Map your core system architecture
  • ·Define minimum required data access per query type
  • ·GDPR data minimisation analysis
  • ·Security clearance process with CISO
B
Integration & Testing
  • ·Secure API connection to core system
  • ·Field-level encryption and access logging
  • ·Extensive staging environment testing
  • ·Penetration testing before go-live
C
GDPR Guardrails
  • ·Per-field access logging with user attribution
  • ·Smart Silence: escalate if confidence insufficient
  • ·Data retention policy enforcement
  • ·Full audit trail exportable for DPA review

Ready to start Phase 1?

Zero IT infrastructure required. Live in 4 weeks. We handle the complexity.